Outdoor sports equipment and infrastructure such as bleachers are exposed to a variety of different weather conditions and over time require maintenance or eventual replacement. As this school year comes to a close and with a new one just around the corner, Woodroffe High School of the Ottawa-Carleton District School Board, commissioned us to remove their existing combination soccer and football goal posts and replace them with a new product.
Our combination football and soccer goals are a popular choice among educational facilities and municipalities where multi-use fields are present. These combination goals allow a permanent fixture that satisfies the needs of two separate sports and are built to endure the toughest weather conditions.
These goals consist of an 8’ x 24’ soccer goal opening with solid 4” square tubing forming the frame of the goal. A two-piece cross bar and the 20’ high football uprights are constructed using 2” square tubing and the unit is completely sandblasted and powder coated white for a chip-resistant finish.
The first part of this project consisted of the removal of the existing goal posts installed on the field. Our team got to work not only dismantling the goals themselves, but also removing the in-ground concrete footings and disposing of them off-site.
The installation crew then poured new concrete footings for both goals and installed the combination soccer goal and football uprights in place.
Although our company is often thought of as simply a manufacturer and supplier of premier equipment, a large portion of our business is derived from service work such as installations, replacements and providing routine safety inspection programs, ensuring facilities across North America are safe for both spectators and participants.