Working alongside key stakeholders from the board, our team was brought in to help with the design and build of a new track and field for Sherwood Secondary School. Serving as home to the school’s Saints athletics department, the board was planning for some major upgrades to the school’s outdoor field. In addition to a brand new track and beautiful field, a request for bleacher seating was made and we were quick to answer the call.
Looking to seat about 200 spectators for upcoming sporting events, the school was looking for the perfect bleacher solution to be included in the recent upgrades. After working closely with members from both the board and school, it was decided that four banks of our popular 5-row bleachers would be just the thing they were looking for.
In addition to seating the masses, the board wanted to ensure that the bleachers would all be safety code compliant in an effort to keep spectators safe at all times. Our team worked closely with the customer and our partners at Worldwide Turf to showcase our compliant bleacher products and the plans and drawings were quickly approved.
Following the manufacturing process, our team shipped the bleachers to the school where they were met by the team at Worldwide Turf. A new concrete pad had been previously installed, so all that needed to be completed was the final installation of the new bleachers.
The bleachers were installed just prior to the start of the new school year and now give students and other spectators alike a little more to cheer about.